<< First  < Previous   Page  1 of 1    Next >  Last >>

Interior construction of the new event and congress location Confex started
Interior construction of the new event and congress location Confex started
View into the future Confexhall of the new event and congress location Confex
View into the future foyer of the new event and congress location Confex
View of the construction site of the new event and congress location Confex
Koelnmesse builds Cologne's largest inner-city photovoltaic system. The picture shows the installation on the roof of the Confex
Koelnmesse builds Cologne's largest inner-city photovoltaic system. The picture shows the installation on the roof of the Confex
Koelnmesse builds Cologne's largest inner-city photovoltaic system. The picture shows the installation on the roof of the Confex
View of the construction site of the new event and congress location Confex
View of the Confex construction site with the new Hall 1
View into the future foyer of the new event and congress location Confex
View of the new Hall 1 with approx. 10,000 m² exhibition space
Hall 1: View of the hall from south-west
Hall 1: Cathedral view with new Hall 1
View of the Confex construction site with the new Hall 1
Hall 1: View of the Messehochhaus with Hall 1
Façade of the new Car Park Zoobrücke, designed by the Stuttgart-based architectural practice wulf architekte

<< First  < Previous   Page  1 of 1    Next >  Last >>